1. If removed, install into place components of coupling (see the Head Stsepleniye and power shafts). 2. Make sure available on the places of two guides of pins. Fix transmission on a jack as did it in the course of dismantle, and carefully get it under the car, having lifted in regular situation. Accurately enter a main shaft into gearing with vents of a nave of the conducted clutch plate. Do not use force at all, – if the main shaft does not enter a nave, adjust a tilt angle of the transmission and slightly turn a shaft, trying to obtain the correct combination of shlits. 3. Screw bolts of fastening of RKPP to the engine, and also bolts of a back arm. Tighten fixture with the required effort. 4. Screw three top bolts of fastening of a box to the engine, and also the lower bolt of fastening of a starter. Tighten fixture with the required effort. 5. Slightly raise the transmission on a jack, establish a bolt and nuts of fastening of an arm of the right support of assembly. Tighten fixture with the required effort. 6. Establish a forward lock arm and tighten bolts of its fastening with the required effort. 7. At the corresponding complete set install the antispray screen. Tighten fixture with the required effort. 8. Disconnect a lifting rigging and screw into place a bolt of fastening of the distributor. 9. Establish a cover of a viewing opening of a dome of coupling. At the corresponding complete set establish stiffening ribs of the power unit. Tighten fixture with the required effort. 10. Further installation is made as it should be, the return to a dismantle order. 11. Fill in in the transmission necessary amount of gearbox oil of the required grade (see the Head Routine maintenance). 12. Pump over hydraulic system of the drive of coupling 13. Make trial runs of the car, checking serviceability of functioning of RKPP. Examine the power unit on existence of signs of leak of liquids.
|